The maintenance calendar

The calendar view of the equipment's maintenance: filters, legend, creating a job by dragging and moving it with drag and drop.

The Maintenance calendar is the visual view of all the maintenance, agenda style. It lets you see at a glance what is due, create a job by dragging on the calendar and move it in time with the mouse. You need the permission Equipment → Read; to move or create jobs by dragging, Equipment → Update and Create.

How to open it

  • From the Port equipment page, the Maintenance calendar button (it shows all the equipment).

  • From the record of a single piece of equipment, the link of the same name (it shows only that one).

The views

At the top you can choose the view: day, week, month, 2 weeks, 4 weeks; the “today” button brings you back to the current date.

The filters

In the general view you can narrow down what you see with:

  • All equipment / All categories — by equipment or by category;

  • Any assignee — by person in charge;

  • the status: Open, Done, All;

  • the Show bookings tick (on when it opens) — overlays, read-only, the equipment's bookings on orders, so you can plan a downtime avoiding the periods when it is needed.

The colour legend

Colour

Meaning

Red

Overdue maintenance

Light blue

Open maintenance

Grey

Done maintenance

Amber

Booking of the equipment on an order (read-only)

Creating and moving jobs

  • Create by dragging: select an empty area of the calendar on the day/time you want; the Schedule maintenance window opens already filled in with the chosen dates (the other fields are those described in Maintenance).

  • Move by dragging: drag a job onto another date/time to reschedule it. If the new position overlaps with another booking, the confirmation request “Schedule it anyway?” appears: you can confirm or cancel and the job goes back to where it was.

Seeing the details

When you click an event in the calendar, its details appear in the panel on the right (without changing page): equipment, title, description, date, assigned people and any downtime window. From there you can edit it, delete it, mark it as done or open the Material and labour in maintenance page to record what was used and the work done. Bookings (in amber) are read-only and lead to the linked order.


See also: Maintenance.