Maintenance

How to plan the maintenance of the marina's equipment: deadlines, downtime windows, the job log and recurring maintenance.

Maintenance means the jobs and reminders linked to a piece of equipment. They range from a simple deadline (“check the crane's cables by the 15th”) to a planned machine downtime with cost, supplier and attachments. You need the permissions Equipment → Read to see them, Create, Update or Delete for the rest.

Where to find it

  • From an equipment record, the Maintenance link shows the list of its maintenance.

  • The Port equipment page shows the count of open maintenance (and possibly overdue): Open maintenance opens the list of all open maintenance, with the same actions.

  • For the calendar view, see The maintenance calendar.

Creating a maintenance job

Press Add maintenance and fill in the form.

The essential fields

Field

What it is for

Title

What has to be done (required).

Description

Details of the job.

Date

The maintenance deadline. It is required: if you only set the downtime window, BlueShell uses the day the downtime starts. Once the date has passed, a maintenance still open becomes Overdue.

Assignee

The people in charge of the job (you can choose more than one): you can filter the calendar by person.

A maintenance job without a downtime window is a deadline: it appears in the list and in the calendar and does not occupy the equipment.

The downtime window (optional)

In the Downtime window (optional) section you can enter the start and end date and time of the downtime. When you set it, this happens:

  • the equipment is considered occupied in that period;

  • if there are already order bookings in that window, a warning appears (see below);

  • the downtime appears in the equipment's calendar and availability views.

If you leave the downtime window empty, the maintenance stays a simple deadline and neither blocks nor flags anything.

The intervention details (optional)

In the Intervention details (optional) section you find the job's log:

Field

What it is for

Repeat every (months)

Leave empty for a one-off job. If you fill it in, when you mark the maintenance as done a new one is created, with the Date moved forward by that number of months.

Cost

The cost of the job.

Supplier

Who carried out the job.

Meter reading

The hour-meter/odometer value at the time of the job.

Work done notes

Notes on the work done.

When editing, the Attachments section is also available for documents and photos.

Recording material and labour

Besides the overall cost, you can record in detail the material used (with the unload from the warehouse) and the labour of the job, taking the articles from the price lists. From the maintenance row press View: the page gathers material, labour and costs. From the calendar, use Material & labor in the details panel. Everything is explained in Material and labour in maintenance.

Marking a maintenance job as done

From the list use the Toggle done command (tick icon) to mark it as done. If the maintenance was recurring, when you close it BlueShell creates the next one by itself.

Before closing it asks you whether to record material and labour (see Material and labour in maintenance).

The statuses you will see are Open, Done and Overdue (open and with a date already past).

When the downtime overlaps with an order

If you set a downtime window that falls on one or more equipment bookings that already exist, BlueShell warns you with the message “This equipment is already used by orders during the downtime window:” and the list of the orders in conflict, and offers you the Plan anyway tick to go ahead knowingly. If planning is set to Allow with confirmation (the default) the warning lets you Proceed; with Do not allow the conflict with the maintenance is instead a block. For the jobs already planned that fall in the downtime, and for how to read the warnings, see Planning warnings, blocks and settings.