Skip to main content

Material and labour in maintenance

How to record on a maintenance job the material used (with the warehouse unload) and the labour, taking the articles from the price lists, and how BlueShell calculates the job's costs.

When you carry out or manage a maintenance job — whether the marina does it itself or an outside company — you can record everything that was consumed and used (the material) and the work done (the labour). The articles are taken from the price lists, and for the material BlueShell can unload the warehouse. In the end you have the complete cost of the job. To record material and labour you need the permission Equipment → Update (assigned in Settings → Users and access → Users and roles → Roles); for everything else about maintenance see Maintenance.

It is like the lines of an order, but simpler: here there is only one level of lines, with no jobs and sub-jobs.

Where to find it — the maintenance page

The recording is done on the maintenance page, which you open with the View button:

  • from the list of an equipment's maintenance;

  • from the open maintenance page;

  • or, from the details panel in The maintenance calendar, with the Material & labor button.

The page shows two things: a summary of the job with the costs at the top, and the table of the material and labour lines with the buttons to add them.

Adding a material line

Press Add material: a window opens where you choose the article from the price list and enter the quantity.

Field

What it is for

Pricelist

Filters the article search on a specific price list (optional: “All pricelists” searches everywhere).

Article

The price list article used. Type to search it by code or description.

Quantity

How many units you used. Next to it appears the article's unit of measure.

Unit cost

Pre-filled from the price list (falling back to the article's cost); you can correct it.

Unload from warehouse

Which warehouse to take the material from. Preset to the yard warehouse. When you record it, the stock is unloaded at once (see below). Leave -- Do not unload warehouse -- if you only want to note the cost without moving stock.

Description and Notes

Free text (the description is pre-filled from the article).

Save and the line appears in the table, with the total cost already calculated (unit cost × quantity).

Adding a labour line

Press Add labor: the window is almost identical, with two differences.

  • As Article you choose a price list item at an hourly rate (labour is an article like any other).

  • The quantity field becomes Hours: you enter the hours worked. The total cost is hourly rate × hours.

  • The Operator field appears, to say who did the work (optional).

  • There is no warehouse unload: labour does not consume stock.

The warehouse unload is immediate

When you save a material line with a warehouse specified, BlueShell unloads the stock at once — there is no button to press afterwards. As with the order lines, the stock is always aligned with what you recorded:

  • BlueShell creates the warehouse movement and reduces the article's stock instantly;

  • the line shows “Warehouse movement registered”, with a link to the movement;

  • if the stock is not enough and the warehouse does not allow negative stock, the line is not saved and tells you straight away (so nothing is left “pending”);

  • lines without a warehouse (in the table the line shows No unload) and articles without stock management move nothing: they are just a cost item.

The unload is an internal consumption: the goods leave the warehouse with no destination customer, and the movement stays linked to the maintenance job.

Editing or deleting a line

  • A material line that has unloaded the warehouse has its article, quantity and warehouse locked (so as not to misalign the stock); cost, operator and notes remain editable. If you need to correct the quantity or the article, delete the line — the unload is reversed and the stock restored — and enter it again.

  • A line without a warehouse (or a labour line) can be edited and deleted freely.

The job's costs

The summary at the top of the page adds everything up:

Item

What it contains

Material cost

The sum of the material lines.

Labor cost

The sum of the labour lines (with the total hours).

Other costs (manual / external invoice)

The maintenance's Cost field (see Maintenance): useful for an outside company's invoice or for expenses not detailed in lines.

Total intervention cost

Material + labour + other costs.

Closing the maintenance

When you close a maintenance job (from the list, from the calendar or from the page), BlueShell first asks whether you want to record material and labour:

  • Register material & labor opens the page to enter them;

  • Close now goes ahead without adding anything.

There is no unload step at closing: the material was already unloaded from the warehouse when you saved each line.


See also: Maintenance.

Did this answer your question?