The page opens when you create an order or a quote, or click a row in Shipyard → Orders or Shipyard → Quotes. It is used by the office staff who follow the work: here you add the jobs, check dates and amounts, print and invoice. The page is the same for both documents; what differs is said in the points below.
1. The blocks, from the top
If the document is frozen or has revisions, a notice appears at the top (see Revising a quote and comparing revisions). If the order's status has the Lock flag, you see “Order is locked and cannot be changed; click here to unlock it.”
Block | What it contains |
|---|---|
Main data | Type and status with their colours, Subject, Related quotes, Children orders and, if the order was born from a job of another order, Born from a job of order (the number, with a link, and the subject): the documents linked to this one, Notes and Notes 2, work progress, the Work number, the customer and boat cards, and the dates: Creation date, Estimated dates (work date and due date), Planned work dates and Real work dates (the actual ones, taken from the jobs). |
Jobs | One panel for each job: see point 2. After the last one, if some job has become an order of its own, a Jobs of this order that became orders of their own panel lists those orders with status, progress and (with the Show price permission) total. It always stays visible, even if you filter the jobs by status. |
Occupancy and Mooring | The berth planned for this order and the mooring costs of the linked contract, with Plan a berth occupation and Add a berth. If you accept the quote and the berth is already occupied, the order is created all the same and the page opens where you decide where to put the boat (see From quote to contract); the contract is linked to the order only after your choice. |
Order summary and totals | Totals, VAT breakdown and Total costs and profit. It updates by itself at every change to a job. It is not shown to people without the Show price permission. On an order from which other orders were born you also see Orders born from this order and the Project total (this order plus those born from it): it is read-only and does not enter the document's totals. |
Due invoicing | The order's installments: see The billing installments of an order. |
Attachments | The files linked to the document. |
Activity and comments | The history of changes, with the option to comment. |
A quote does not move the warehouse: it only counts in Stock requirements, if you choose its statuses.
2. The jobs
Each job is a panel with its description, its status in the pipeline, progress and assigned people. Inside there are the tabs Rows (in a quote Quote), Work, Notes and Messages; the More actions menu holds the rest (Reprice the line, Why this price?, Translations, Cancel this line out if the job is already invoiced, Turn into an order, Delete). The edit button at the top of the panel changes description, quantity, price and cost without leaving the page. A job that is too big can be turned into an order of its own: Turning a job into an order.
Panels load in groups, with a progress bar (Loading N of M). If a panel does not load, Reload appears: reload it before using the actions on several jobs, because if loading stalls the actions show up anyway and would act only on the jobs that were loaded.
Above the panels:
Add job creates a new job; Sort jobs opens a window where you drag them into the order you prefer.
With two or more jobs the legend Jobs by state appears: a chip for each status, with the number of jobs. One click shows only the jobs in that status, a second click shows them all. Hidden jobs are not touched by the actions on several jobs.
Expand all and Close all open or close all panels; with Compress on close a closed panel takes up less space.
3. Actions on several jobs
Select all ticks the boxes of the jobs. Then the With activities selected menu does:
Document | Items |
|---|---|
Quote | Create a new order with the ticked jobs; Add to existing order, to put them in an order that already exists (in the Add elements to existing order window choose the order and press Confirm). |
Order | Create invoice, Mark as done, Mark as in progress, Mark as yet to be done, Move to another order. |
At the bottom of the panels, With subdetails selected offers, on an order only, Move outside and create a work: it turns the ticked sub-jobs into a job of their own.
If you tick nothing, you see “Please select at least one activity.”; if you do not choose the order in the window, “Please select an order.”
4. The side menu
The items depend on the document and on what you are allowed to do.
Item | What it is for |
|---|---|
Update order / Update quote | Reopens the creation form (Creating an order or a quote). |
Delete, Duplicate | Delete the document or make a copy of it; they ask for confirmation. |
Add bundle, Add job | Add jobs; they are not there if the document is frozen. |
Translations | All the translatable text of the document on one page. |
Planning, Dependencies (graph), Equipment | The order's planning calendar, the graph of dependencies between jobs (see What article dependencies are) and equipment booking. |
Generate from detailed pricelist | Creates the rows from the detailed price list (see Generating a quote from an order). |
Rates and amounts | All the amounts on one screen (Rates and amounts: all the amounts on one screen); it needs the Show price permission. |
Freeze and open a revision | On a quote only (Revising a quote and comparing revisions). |
Compare with orders / Compare with quote | Appears when the quote and the order are linked (Comparing the quote with the final account). |
Marin.AI | A menu with End-of-job report (not on quotes: The end-of-work report), Compose from a note (Building a quote from a note) and Suggest more services (What is a quote missing?). |
5. The right-hand column
Options: Print options chooses which jobs to print and whether to print the workforce (Print order details); below there are the print buttons for the templates, and Apply discount. For orders with yard jobs there is also Picking list: a PDF with the order's materials, grouped by warehouse and in path order, with a box to tick, the location clearly visible and, for items kept in lots, the lot to pick. It is not there for quotes and supplier orders.
Material: for orders with yard jobs (not for supplier orders) it says whether what the jobs still have to pick from the warehouse is Ready, On its way, Arrives late or Missing, lists up to six rows that are not ready and leads to Material of every job (Stock requirements). It needs the permission to read the warehouses and the Yard module. If an item with serial numbers went out without a number, the order page flags it (Lots, expiry dates and serial numbers).
Related invoices (and Related proforma): invoicing the order (Invoicing an order).
Create message: prepares an e-mail or an SMS to the customer with an attachment of the document.
The electronic signature, if active (Having a quote or an order signed).

