Weekly schedules tell you when an operator usually works; absences tell you when, on specific dates, they are not there.
Where to record them
Settings → Users and access → Users and roles: on the user's row, the Absences icon (next to Working hours);
or from Operator workload: open the operator and press Manage absences.
You need the Manage working hours and absences permission (whoever can edit users has it too).
Adding an absence
In the Add absence box:
Field | Notes |
|---|---|
Absence type | Holiday, Sick leave or Leave |
All day | on to start with: enter From and To |
(by the hour) | switch off All day: a single Date with Start time and End time (in 30-minute steps) |
Notes | optional |
Press Add absence: “Absence saved.” If the operator already has planned work in that period, a yellow box appears while you fill in, with the orders, boats and jobs involved.
An hourly absence must fall within a single day. In the Registered absences list you edit (pencil) or delete (bin) each absence.
What changes in planning
Duration of the work: the hours of a job are not counted during an absence, as on a closing day (see How long a job takes and how it is spread).
Warning: assigning a job that starts during an absence shows a non-blocking warning, for example “… is absent (…) on ….”, with Proceed.
Collisions: the Collisions list (the button at the top right of the Calendar and of the Board) flags Work during absence, also for an absence recorded after planning.
Board: absences are striped bands on the operator's row (blue holiday, red sick leave, purple leave); on the Calendar they appear for the chosen operators while the Plan operators window is open.
Operator workload: the available hours go down and Absent 8 h (for example) appears; a job planned in an absence can take the load over 100%.
An operator with no saved weekly schedule has no capacity, so absences do not change their load.